EPEX Tips

Q. If my proposal is denied do I have to re-enter all of the information and create a new proposal to route it again?

A. No.  If the proposal is accidentally denied or denied to allow corrections and has a status of “REF#”, once the necessary action has been taken, click Save and Route to re-route the proposal.  If the proposal was denied because it was no longer needed, the due date should be changed to 01/01/2001, as this will make it invisible to queries run by OSP.  Also, this proposal can be reused in the future if the PI remains the same.

 

This entry was posted in EPEX Tips. Bookmark the permalink. Both comments and trackbacks are currently closed.