{"id":7541,"date":"2017-05-23T12:04:07","date_gmt":"2017-05-23T17:04:07","guid":{"rendered":"https:\/\/scholarblogs.emory.edu\/woodruff\/?p=7541"},"modified":"2017-05-23T12:04:07","modified_gmt":"2017-05-23T17:04:07","slug":"levelonesummer2017","status":"publish","type":"post","link":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/2017\/05\/23\/levelonesummer2017\/","title":{"rendered":"Woodruff Library Level 1 Summer Renovations"},"content":{"rendered":"<p>Level 1 in Woodruff Library will be undergoing renovations this summer, starting on May 9<sup>th.<\/sup>\u00a0 These renovations will add more seating, a variety of new furniture, and additional power outlets to the Learning Commons on Level 1. <a href=\"http:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2017\/05\/Level-One-Renovation-Web-Graphic-Blog_opt-e1493917386581.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignright wp-image-7542 size-full\" src=\"http:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2017\/05\/Level-One-Renovation-Web-Graphic-Blog_opt-e1493917386581.jpg\" alt=\"\" width=\"482\" height=\"269\" srcset=\"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2017\/05\/Level-One-Renovation-Web-Graphic-Blog_opt-e1493917386581.jpg 482w, https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2017\/05\/Level-One-Renovation-Web-Graphic-Blog_opt-e1493917386581-300x167.jpg 300w\" sizes=\"(max-width: 482px) 100vw, 482px\" \/><\/a><\/p>\n<p>To accomplish this goal, a large percentage of the microform and print government document collections on Level 1 will move to the Library Service Center over the summer.\u00a0 The move is scheduled to be complete by early June, when construction will start.<\/p>\n<p>During the project, the seating area of Peet\u2019s caf\u00e9, the meditation room, and group studies on Level 1 will not be accessible. All student technology resources including printers and Mac and Windows workstations will be removed and stored during renovation; patrons may find workstations on Level 2 and the Music and Media Library.\u00a0 <a href=\"http:\/\/it.emory.edu\/studentdigitallife\/support\/student-technology-support\/\">Student Technology Support (STS)<\/a> will remain open to students throughout the summer with consultations taking place inside the glass enclosure.<\/p>\n<figure id=\"attachment_7544\" aria-describedby=\"caption-attachment-7544\" style=\"width: 682px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2017\/05\/Screen-Shot-2017-05-04-at-12_opt.png\"><img decoding=\"async\" class=\"wp-image-7544 size-full\" src=\"http:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2017\/05\/Screen-Shot-2017-05-04-at-12_opt.png\" alt=\"\" width=\"682\" height=\"435\" srcset=\"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2017\/05\/Screen-Shot-2017-05-04-at-12_opt.png 682w, https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2017\/05\/Screen-Shot-2017-05-04-at-12_opt-300x191.png 300w\" sizes=\"(max-width: 682px) 100vw, 682px\" \/><\/a><figcaption id=\"caption-attachment-7544\" class=\"wp-caption-text\">LEVEL ONE proposed floor plan, Woodruff Library<\/figcaption><\/figure>\n<p>A small number of microform cabinets will remain on Level 1.\u00a0 These cabinets will not be accessible to the public until the renovations are complete. Library Service Desk staff will retrieve reels from these cabinets while renovations are under way.\u00a0 One microfilm scanner will be temporarily relocated to the Library Service Desk area on Level 2 during construction.\u00a0 Please contact the Library Service Desk (<a href=\"javascript:secureDecryptAndNavigate('wlnKYAPrSLLyeJd3AN1RsHapEQ0V3T3u2snNKs8GgTFGDQPgon+8wuMEwdB7UZ3yJT1ni1APk2DMjZMYgsCPAdnoKYJF2hfO5TJcxj6oAx3wAnhLPNDVuIg=', '10141fb37f5951040eaf871acc54837048e00740e443e7bada667c4c89e4ac77')\">servicedesk [at] mail [dot] library [dot] emory [dot] edu<\/a>) for assistance in finding materials.<\/p>\n<p>Collections that are moving to the Library Service Center will be unavailable while they are being moved, and the discoverE record will be temporarily removed from public view. \u00a0Once added to the Library Service Center, discoverE will reflect the new locations, and these collections will be available for requesting and delivery to the Library Service Desk.\u00a0 Certain non-circulating collections, such as microforms, will only be available for in-house use.\u00a0 Please be sure to contact the <a href=\"javascript:secureDecryptAndNavigate('bRfhobsJmwwjgziJRiZyMUp+HdS0V0iOCf6VNHbOX80\/S1+wwa7v1pBRyKZW\/PHJajLZULoCBcwloWTJiLJLaSNf7m4q5xT9LpnS8uXIVWCmx5Clf0DKdiM=', '10141fb37f5951040eaf871acc54837048e00740e443e7bada667c4c89e4ac77')\">Library Service Desk<\/a> as far in advance as possible to verify the availability of library materials.\u00a0 You may also request materials, if eligible, through <a href=\"mailto:genill@mail.%20library.emory.edu\">Interlibrary Loan<\/a>.<\/p>\n<p>For more information, please consult this guide:<\/p>\n<p><a href=\"http:\/\/guides.main.library.emory.edu\/collection_management\/level1move\">http:\/\/guides.main.library.emory.edu\/collection_management\/level1move<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Level 1 in Woodruff Library will be undergoing renovations this summer, starting on May 9th.\u00a0 These renovations will add more<\/p>\n","protected":false},"author":1979,"featured_media":7542,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-7541","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"jetpack_featured_media_url":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2017\/05\/Level-One-Renovation-Web-Graphic-Blog_opt-e1493917386581.jpg","jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":6517,"url":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/2015\/08\/14\/summerconstructionupdate\/","url_meta":{"origin":7541,"position":0},"title":"Emory Libraries&#8217; Summer Construction Update","author":"caloveladmin","date":"August 14, 2015","format":false,"excerpt":"It\u2019s been a busy summer of renovations and construction for the Emory Libraries, and several projects are about to be finished and ready to open for fall semester. The total renovation of MARBL on Level 10 of the Woodruff Library is getting some finishing touches and will open initially for\u2026","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/category\/news\/"},"img":{"alt_text":"The Science Commons, with a library service desk and comfortable seating, is located in the atrium of the Atwood Chemistry Center.","src":"https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2015\/08\/SciCommons2_opt-300x225.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5601,"url":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/2014\/05\/02\/learning-commons-renovation-summer-2014\/","url_meta":{"origin":7541,"position":1},"title":"Learning Commons Renovation Summer 2014","author":"caloveladmin","date":"May 2, 2014","format":false,"excerpt":"This summer Level 2 Learning Commons in Woodruff Library will undergo major renovations, the first phase in a multi-year project to update the Learning Commons spaces in Woodruff Library.\u00a0 These renovations will create a comfortable and flexible environment that supports student collaboration and increased use of mobile devices.\u00a0 Included in\u2026","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/category\/news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2014\/05\/lc_students_lg.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2014\/05\/lc_students_lg.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2014\/05\/lc_students_lg.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2014\/05\/lc_students_lg.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]},{"id":10018,"url":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/2017\/06\/06\/woodruff-library-level-1-renovations-underway\/","url_meta":{"origin":7541,"position":2},"title":"Woodruff Library Level 1 renovations underway","author":"caloveladmin","date":"June 6, 2017","format":false,"excerpt":"Renovations begin on June 13 on Level 1 of Emory University\u2019s\u00a0Woodruff Library, which will be redesigned for undergraduate use. The space will be updated with new furniture and carpeting, additional seating, and more power outlets for charging portable electronic devices. Peet\u2019s Coffee & Tea, which is closed for the summer,\u2026","rel":"","context":"In &quot;Press Releases&quot;","block_context":{"text":"Press Releases","link":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/category\/press-releases\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2020\/01\/peets-workstations-499-326.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5624,"url":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/2014\/05\/16\/libraryfacilities\/","url_meta":{"origin":7541,"position":3},"title":"Heads Up!  Library Facilities projects this summer","author":"caloveladmin","date":"May 16, 2014","format":false,"excerpt":"Emory\u2019s commencement is over, but the library is busy this summer with lots of facilities projects.\u00a0\u00a0 Here is a quick list of some of the changes underway: Jazzman\u2019s conversion to Peet\u2019s Level 1 \u2013 complete by August 2014 NextGen Learning Commons Level 2 \u2013 renovation to be complete by August\u2026","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/category\/news\/"},"img":{"alt_text":"Peets_opt","src":"https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff\/files\/2014\/05\/Peets_opt-300x240.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":13812,"url":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/2022\/05\/02\/lobby-renovation-on-tap-for-woodruff-library\/","url_meta":{"origin":7541,"position":4},"title":"Lobby renovation on tap for Woodruff Library","author":"caloveladmin","date":"May 2, 2022","format":false,"excerpt":"The Woodruff Library lobby is getting a long-awaited makeover. Renovation construction will begin just after Commencement on May 9 and will continue throughout the summer. Improvements will include making the entrance ADA compliant and remodeling the waiting areas. \u201cWe\u2019re excited to begin fall semester with a new, more welcoming and\u2026","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/category\/news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2022\/05\/woodruff-lobby3.jpg?resize=350%2C200","width":350,"height":200},"classes":[]},{"id":5668,"url":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/2014\/06\/12\/pictures-of-the-week\/","url_meta":{"origin":7541,"position":5},"title":"Woodruff Library Building: Pictures of the Week &#8211; June 12","author":"caloveladmin","date":"June 12, 2014","format":false,"excerpt":"\u00a0 Related Links: MARBL\u2019s major renovation is planned for completion in fall 2015. To follow the progress, please see the MARBL renovation page. Summer projects: Woodruff Library's level 2 renovation to foster group collaboration, enhance mobile device use","rel":"","context":"In &quot;News&quot;","block_context":{"text":"News","link":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/category\/news\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2014\/06\/Buidling-thumbnail.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2014\/06\/Buidling-thumbnail.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2014\/06\/Buidling-thumbnail.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/scholarblogs.emory.edu\/woodruff-sandbox\/files\/2014\/06\/Buidling-thumbnail.jpg?resize=700%2C400&ssl=1 2x"},"classes":[]}],"_links":{"self":[{"href":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/wp-json\/wp\/v2\/posts\/7541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/wp-json\/wp\/v2\/users\/1979"}],"replies":[{"embeddable":true,"href":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/wp-json\/wp\/v2\/comments?post=7541"}],"version-history":[{"count":0,"href":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/wp-json\/wp\/v2\/posts\/7541\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/wp-json\/wp\/v2\/media\/7542"}],"wp:attachment":[{"href":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/wp-json\/wp\/v2\/media?parent=7541"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/wp-json\/wp\/v2\/categories?post=7541"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/scholarblogs.emory.edu\/woodruff-sandbox\/wp-json\/wp\/v2\/tags?post=7541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}